Tuesday 29 October 2013

Day 3 Filming - Studio

Today we started filming in the studio for the first time with Hannah and D'angelo. Hannah was great but unfortunately the lead male character was not up to our standards. We are currently looking for a replacement.

Wednesday 9 October 2013

Risk Assessment



We done a risk assessment on each of our locations to make sure that it was safe for not only us but for our actors as well. We all signed it and took careful consideration in making sure it was suitable to film at the particular location.

Risk Assessments











Thursday 3 October 2013

Post - Production Day 3









Today we finally finished our Story Board, it was stressful but we finally finished. We made sure the storyboard was detailed so that when were filming it would be easier to film

Wednesday 2 October 2013

Post- Production Day 2





we continued the story board and this is how far we got.

Pre- Production - Day 1

Today we started doing out pre-production. As a group we are currently doing out storyboard. Its very time consuming as we have to visualise every aspect that we want include in the music video. We want it to be very detailed so its easier when we are shooting. Here's what we've done so far: